Feed aggregator

Jay Tyler’s Top 5 AoIP Trends

Radio World - Thu, 09/19/2019 - 12:09

Radio World’s new ebook “AoIP for 2020” is our biggest to date; find it at radioworld.com/ebooks. This article is one in a series exploring that topic. Author Dee McVicker handles marketing and communications at Wheatstone.

There is far more to AoIP than routing and connecting things. It is because of AoIP that we can pan studio cameras at exactly the right moment or load an entire studio of controls onto a tablet, for example.

Where is this all going?

Jay Tyler

Here are the top five AoIP trends, according to Jay Tyler, Wheatstone’s director of sales, who has been involved in hundreds of studio projects.

Native AoIP across distances. There’s a lot of sharing going on these days, from sharing VOs and bumpers between sister stations and sports venues to putting everything into one main operating center for several stations scattered across a region. Being able to move native IP audio and control across distances is why. The cost savings are significant in terms of staff, infrastructure and workflows, and disaster recovery doesn’t get much better than having your essential operation up in a cloud or in another Zip code while dealing with a disaster situation in the studio.

“We don’t care where music lives,” Tyler said. “We can pull it in or we can control it remotely. We can mix it remotely, send it to your transmitter site, bypass the studios, whatever you want us to do, we can now do it using a combination of AoIP logic controls, codecs and connectivity.”

Native IP for phone-ins, too. Connecting VoIP phones directly into the AoIP network without hybrids or stepping through analog-digital conversions means you can do so much more than just route one or two mic feeds down the phone line. You can split feeds, set up multiple sends, customize talkbacks, routing and conference feeds — all possible now that VoIP phones can connect directly into the native IP audio environment.

SNMP everything. “Everyone wants to know what everything is doing, and they’re doing it with SNMP,” he said. SNMP is a set of standards used for monitoring and managing data from servers, printers, hubs and switches. AoIP networks and devices that are SNMP-enabled have MIB files that define relevant data points for monitoring bitrates, temperatures, signal flow and other network details.

For example, WheatNet-IP BLADE I/O units have MIB files with data points for monitoring as well as alerting if a particular port is dropping packets or if a device is heating up and about to fail. In addition to devices containing MIB files, an SNMP browser or management tool is needed for managing networks.

Virtual interfaces into the network. UIs into the IP audio network are taking many forms today, from signal monitoring and switching control panels to news desks complete with talkback button, metering and weather, sports and stock market feeds. Meanwhile, according to Tyler, standalone virtual mixing consoles such as Wheatstone’s Glass LXE are popular in mid-market production rooms because they’re affordable to set up and use, and extremely serviceable for today’s production needs. With native audio IP able to cross distances as mentioned earlier, we can now tap into and control signal streams inside or outside a facility from any user interface available, whether it’s a multi-touch flatscreen or a mobile phone.

AES67 Everywhere. AES67 is no longer an afterthought. This audio transport standard is becoming an important part of the AoIP landscape as we move more and more audio between network systems. Also up and coming are complementary standards based on NMOS and AES70, which promise to add discovery, control and connection management to the interoperability mix.

Comment on this or any story to radioworld@futurenet.com.

The post Jay Tyler’s Top 5 AoIP Trends appeared first on Radio World.

Using Digital Radio to Boost Listening Figures and Revenues

Radio World - Thu, 09/19/2019 - 02:00

AMSTERDAM — The WorldDAB conference “Radio Distribution Strategies for a Connect World” focused on new and innovative ways to reach and attract audiences in a connected world.

The speakers’ panel at the WorldDAB session during IBC2019. (L to R) Patrick Hannon, Graham Dixon, Michael McEwen, Jørn Jensen, Simon Mason, Andrew Murphy, Jordi Gimenez and Jacqueline Bierhorst.

During the event, Jørn Jensen, senior adviser at NRK, highlighted how the advent of digital radio reversed the trend of radio listening figures in Norway. For years the overall listening values had been slightly decreasing, similar to what was happening in the rest of Europe.

In 2019, after the completion of the FM switchoff, the listening figures began to rise again, he explained. Clearly, the need to replace a legacy radio receiver with a new, digital-capable one did not scare Norwegians, driving them to leave radio behind and massively embrace alternative audio platforms.

NOT MAINSTREAM

“DAB gave Norwegian listeners a much wider choice,” said Jensen. “Apart from moving from three to 15 national radio channels, 35% of all radio listening is now to ‘digital only’ stations, which previously did not exist.”

Norwegian broadcasters were able to design new stations for smaller target groups outside the mainstream market. The NRK station P1+ (targeting listeners over 55), for example, rose to 6th position during its first week on air.

Jørn Jensen said listeners figures rose in Norway after the FM switch-off.

Also, radio commercial revenues can benefit from the digital radio adoption. Even if the United Kingdom experienced a false start with DAB, after 2010 digital radio definitely had a stable comeback there, and now the U.K. is a leading market for DAB.

Overall radio commercial revenue (including FM) followed the rising trend of digital radio popularity. Patrick Hannon, WorldDAB president, emphasized that overall commercial revenues climbed up by 24% from 2014 to 2018.

NATIONAL BRANDS

Patrick Hannon, WorldDAB president, gives a keynote speech and wraps up the session.

“Commercial broadcasters usually see more competition and more costs in the

DAB market,” Hannon said. “But DAB gave them the opportunity to establish national brands, which are transforming the perception of commercial radio in the U.K.” In his opinion, national brands are at the heart of the revenue growth.

The WorldDAB session also focused on the need for broadcast digital radio to secure its place through a fluid distribution mix of the advanced markets are now experiencing all around the world.

The session’s speaker panel also included Graham Dixon, head of radio at the EBU); Michael McEwen, director general for NABA; Simon Mason, head of broadcast radio technology at Arqiva, Andrew Murphy, lead research engineer at BBC R&D; Jordi Gimenez, project leader 5G at Institut für Rundfunktechnik; and Jacqueline Bierhorst, on behalf of Radioplayer Worldwide.

[Read: AoIP, Cloud and Digital Radio in Focus at IBC]

All the speakers agreed that a multiplatform digital radio strategy is necessary to preserve the value proposition of radio in a connected and evolving world.

“We have to maintain trustability and relevance — our content has no value, unless people are using it,” Jørn Jensen concluded.

The post Using Digital Radio to Boost Listening Figures and Revenues appeared first on Radio World.

Low Power FM Radio Service Technical Rules

Federal Register: FCC (Broadcasting) - Thu, 09/19/2019 - 00:00
In this document, the Federal Communications Commission (Commission) seeks comment on a Notice of Proposed Rulemaking (NPRM) proposing to improve technical rules that primarily affect Low Power FM (LPFM) radio stations, based upon a petition for rulemaking filed by REC Networks.

Applications

FCC Media Bureau News Items - Wed, 09/18/2019 - 20:00
.

Pleadings

FCC Media Bureau News Items - Wed, 09/18/2019 - 20:00
.

Actions

FCC Media Bureau News Items - Wed, 09/18/2019 - 20:00
.

Broadcast Actions

FCC Media Bureau News Items - Wed, 09/18/2019 - 20:00
.

The FM Class C4 Proposal: The Latest

Radio World - Wed, 09/18/2019 - 19:05
Matthew Wesolowski

The author is CEO of SSR Communications, owner of WYAB(FM) in central Mississippi.

A proceeding currently before the Federal Communications Commission to provide eligible Zone II Class A commercial FM broadcasters an opportunity to upgrade from 6 kilowatts to 12 kilowatts has not attracted a great number of headlines this year, but that has not prevented the FM Class C4 proposal from making some significant strides as of late.

Most noteworthy, the Class C4 FM idea has attracted some powerful allies. In January, the proposal won the backing of the Sen. Roger Wicker of Mississippi, sitting chairman of the U.S. Senate Committee on Commerce, Science, and Transportation, the Congressional body that maintains direct oversight over the FCC. Sen. Wicker noted that the power increase could be of particular benefit to “small and rural radio stations” in a letter to FCC Chairman Ajit Pai. In his February, 2019 reply, Chairman Pai agreed by saying that the FM Class C4 option “could be especially important for small, minority-owned stations that currently cannot serve their entire communities.”

Sen. Wicker now joins the list of approximately 130 small broadcasters who filed comments in full support during the FM Class C4 Notice of Inquiry (MB 18-184, FCC 18-69) filing windows in September, 2018. Several years prior, FCC Chairman Ajit Pai first advocated for the new station class in September, 2016 at the NAB/RAB Radio Show in Nashville, Tenn., and going back further, the Multicultural Media, Telecom and Internet Council (MMTC) supported the effort in 2013 when it helped author the original proposal.

[Read: Where Things Stand for FM Class C4: the Waiver Route]

Predictably, a turf war has erupted between the small broadcasters that the FM Class C4 proposal would benefit, and larger license holders who generally control the biggest signals in any given market. The National Association of Broadcasters did not support the introduction of a new station class, which is unsurprising, as that same organization vehemently opposed the creation of the FM Class C0 allotment type some 20 years earlier. Although larger companies stopped short of endorsing the idea fully, some nationwide broadcasters did come out in support of the FM Class C4 concept, including Educational Media Foundation, while iHeartMedia did not oppose the new station class in its comments.

The current sticking point in the FM Class C4 proceeding appears to stem from a component of the proposal that would give certain underbuilt Section 73.207-licensed stations a Section 73.215 designation, provided that the affected station has operated under its maximum antenna height, power level, or equivalent thereof, for a period of ten years or more. Under the current FCC rules, a neighboring station looking to upgrade that is adjacent to an underbuilt Section 73.207-licensed station must treat that station as if it were fully built out, whereas a Section 73.215 station can be protected assuming its actual antenna height and power level.

The practice of treating underbuilt stations as if they were fully constructed can have large implications for smaller adjacent stations wanting to upgrade in power or situate their antenna sites more favorably. For example, a full FM Class C1 station is able to broadcast with 100 kilowatts of power from an antenna height above average terrain of 299 meters. If that station were to have an antenna height of only 200 meters above average terrain, then its primary service contour would be about 5 miles short of what a fully built FM Class C1 facility could reach. Any competing neighboring station looking to upgrade is compelled to protect that underbuilt station for five extra miles of coverage that it does not (or if underbuilt for more than 10 years, likely will not ever) serve.

In August, 2019, SSR Communications Inc., which co-authored the FM Class C4 petition with MMTC, presented a revised version of the Section 73.215 aspect of the proposal to the FCC’s Audio Division. The amended plan would still call for redesignation of certain underbuilt Section 73.207 licensed stations as Section 73.215 authorizations, but would also provide a 3 dB protective “buffer zone” to allow the affected stations an opportunity to relocate or build out more fully in the future. The buffer zone would create a protective bubble around underbuilt stations, usually amounting to anywhere from 3 to7 miles, depending on how severely underpowered or under-height the affected station may be.

This 3 dB buffer zone “compromise” would resolve the controversial aspects of the FM Class C4 proposal and should allow the proposal to advance. The buffer eliminates almost all scenarios in which an affected reclassified Section 73.215 facility could be hemmed in and blocked from making future service improvements or tower relocations. It would also disincentivize the Section 73.215 conference procedure for stations seeking such towards neighboring underbuilt Section 73.207 facilities in almost all cases, except for those involving Section 73.207 stations that are the most decidedly underbuilt with respect to their class. Indirectly, the buffer prevents almost any scenario in which a secondary service could be affected by the Section 73.215 component of the FM Class C4 idea.

Meanwhile, an alternative waiver-based path towards a FM Class C4 equivalent facility may also soon exist. In July, 2018, WRTM(FM) 100.5 MHz asked the Federal Communications Commission to consider allowing the station to double in power from 6 kilowatts to 12 kilowatts. If granted, the WRTM waiver application would establish new precedent and provide certain Class A FM stations an opportunity to enjoy an improvement in coverage.

Unlike the FM Class C4 proposal, the WRTM application (BPH-20180716AAC) suggests that, in order to double in power, a Class A FM licensee should guarantee that its upgraded signal would not impact vital LPFM and FM translator services. Also departing from the Class C4 FM proceeding is the idea that a neighboring Section 73.207-licensed station could still be reclassified as a Section 73.215 facility if it is not built out fully, but only if that station has been operating below its antenna height or maximum power level for a period of 30 years (the FM Class C4 proposal states that a 10-year window is appropriate). The WRTM filing backs this argument by saying, “No zoning problem, FAA issue, or cost consideration could not be resolved within 30 years if the desire is truly there to build out fully.”

Whether moving forward “as is,” as an amended proposal with a 3 dB buffer zone consideration, as a waiver-based procedure for eligible stations, or something else altogether, what will happen next in the FM Class C4 proceeding is anyone’s guess. What is clear is, however, is that hundreds of FM Class A stations would be able to double in power and would gladly do so if given such an opportunity. With support in high places, it seems as if a breakthrough is just around the corner, and it could be sooner than later that the FM Class C4 idea moves from concept to reality.

[Subscribe to our newsletter and get it delivered right to your inbox.]

 

The post The FM Class C4 Proposal: The Latest appeared first on Radio World.

Small AM Station Hit With Violation Notice Over Tower and Station ID

Radio World - Wed, 09/18/2019 - 17:06

A recent visit to the small agricultural town of Hughson, Calif., led Enforcement Bureau staff to note that one Spanish-language station was in alleged violation when it came to lighting and painting its tower/antenna and noting on-air proper station identification.

The agent noted that on more than one occasion, there was no station identification announcement at the hour for KLOC(AM) 1390 kHz, which is licensed by La Favorita Radio Network. FCC rules say that broadcast station identification announcements shall be made hourly and as close to the hour as feasible.

[Read: FCC Pulls License of Alabama Station a Second Time]

The agent also noted several alleged tower and antenna issues, including irregular painting on an antenna installation, inadequate lighting, failure to notify the commission about inoperable lighting and faded painting.

The FCC Rules lay out specific requirements when it comes to painting and lighting towers and antennas — even relying on a paint tolerance chart created by the Federal Aviation Administration and given the heavy name of an In-Service Aviation Orange Tolerance Chart. FCC Rules also say that antenna structures should be cleaned and repainted as often as necessary to maintain good visibility.

So, too, are the FCC rules clear on tower lighting. A tower must be painted for visibility during daytime; during the night, a series of top flashing red obstruction lights and midpoint sidelights must be lit and operational. When those lights are not operating for some reason, the owner of the antenna structure has to report the problem to the FAA unless the lights are corrected within a 30-minute time frame. That notice — called an FAA Notice to Airmen — hadn’t yet been filed by the station, the Enforcement Bureau said.

The FCC has given La Favorita 20 days to submit a written statement explaining the violations and to clarify what action will be taken from here. The commission said it may take further action if warranted, including issuing a Notice of Apparent Liability for Forfeiture.

[Subscribe to our newsletter and get it delivered right to your inbox.]

 

The post Small AM Station Hit With Violation Notice Over Tower and Station ID appeared first on Radio World.

FCC: The Time to Request Repack Reimbursements Starts Now

Radio World - Wed, 09/18/2019 - 16:36

When it comes to requesting a reimbursement for repack-related expenses, the clock starts now.

Low-power TV, translator and FM radio stations have a pool of $150 million from which to request funds after the Federal Communications Commission voted in March to allocate additional funding for those adversely impacted by the post-incentive auction TV station repack. The FCC Incentive Auction Task Force and the Media Bureau have since outlined procedures for reimbursing those left out of the first round of funding from the TV Broadcaster Relocation Fund.

The first step, according to a webinar hosted by Hillary DeNigro, deputy chair of the FCC’s Incentive Auction Task Force, is to get a reimbursement form filed in the LMS database (known as FCC Form 2100, Schedule 300). The deadline for that filing is Oct. 15. That form includes an eligibility section as well as a broadcaster relocation reimbursement estimates section.

[Read: Where Did Those Applications Go? Check the LMS]

Next up: file a banking form (Form 1876) in the CORES incentive action financial module database to clarify where funds should be sent.

In the webinar, attorneys and specialists from the FCC walked listeners through the eligibility requirements charts for this process, noting that are unique and separate rules for LPTVs, translators and FM stations when it comes to eligibility.

See the charts for eligibility requirements for both LPTV/TV translator stations and FM stations.

But DeNigro stressed stations should not wait to receive feedback on whether or not they are eligible for stations to start submitting expenses. “You should not wait to receive feedback on eligibility,” she said. “We encourage you to not wait but to [go ahead and] submit the forms because we are reviewing materials as we receive them.”

How much can a station expect to receive? That will be dependent a number of factors, DeNigro said, including the number of stations that file, the aggregate dollar value of verified estimates received by the commission, and the amount available for reimbursement based on that category of stations.

Payments will be made on a rolling basis; so get your invoices in, she said. “You don’t need to until you have everything together before you submit payment.”

Once a station’s move is finalized and all expenses have been accounted for, a final form 399 is needed to let the commission know that you’re closing out your account. The deadline for those forms is July 3, 2023.

[Subscribe to our newsletter and get it delivered right to your inbox.]

 

 

The post FCC: The Time to Request Repack Reimbursements Starts Now appeared first on Radio World.

How to Get Rid of That Mouse in the House

Radio World - Wed, 09/18/2019 - 11:40

“The early bird gets the worm, but the second mouse gets the cheese.”

Component old age is not the only cause of equipment failures. Another, more disgusting, one is vermin infestation, which will become common again now that cooler weather is upon much of the nation.

If you haven’t taken steps to place bait traps and moth balls around your remote transmitter site, now is the time. All sorts of animals are attracted to the warmth of your transmitter building; and they will quickly set up home, sometimes in or on your equipment. See Fig. 1.

Fig. 1: DA parameters out? No, the antenna monitor was being used as a mouse outhouse. The top vents on the monitor served to channel liquid inside, destroying printed circuit boards.

Stop the problem before it begins. Rodents like to travel along walls; place your glue or bait traps there to snag them before they get into your equipment racks.

Little black mouse droppings on the floor of the building or enclosure are a signal for action. If you find that your site has been infested, protect yourself while removing nest and droppings. Wear gloves, a gown and above all a mask to avoid breathing hazardous airborne pathogens.

Fig. 2: A useful resource can be found at www.bestwaytogetridofmouseinhouse.com/mouse-infestation/#risks.

John Wells has written a useful tutorial on illnesses spread by rodents and offers useful tips to ensure their removal. The URL is in the caption for Fig. 2. YouTube also has a number of videos; search “removing mouse infestation” for tips.

 

***

 

Broadcast engineer Tom Norman read with interest our discussion about Frank Hertel’s experience with electrolytic capacitors in an FM exciter. It brought back memories that may be useful for other readers.

Tom remembered an instance in which a remote control system failed. His tests couldn’t produce a reason, but its operation remained horribly intermittent. Tom decided to station himself at the transmitter site until he could figure out what was wrong.

He started with the usual, checking power supply voltages using a VOM. No issues. He checked the same power supply rails with the ’scope. Still nothing wrong.

At one point in the circuit, one of the power supply voltages was further regulated using a three-terminal regulator. Scoping the output of that regulator, he hit the regulator with freeze mist. The tiny amount of ripple disappeared. Tom is not sure what possessed him to check the input terminal of the regulator, but when he did he saw significant ripple. Why was there more ripple on the input of this chip than was present at the output of the regulated power supply feeding it? He froze the chip again and it calmed down.

Tom replaced the chip. No difference. That’s when he considered what was attached to the input and output terminals of the chip. You guessed it: There was a small electrolytic on the input. Tom replaced it. The power supply calmed down, but he still had erratic behavior from the remote control unit.

Tom’s next step was to freeze mist all the active components. He was about to freeze a 741 Op Amp but inadvertently touched it with the little straw from the nozzle of the can of mist. The remote control unit went from erratic to totally dead. He poked the Op Amp again, no difference. He froze it. Back to erratic operation. Tom replaced the Op Amp. Operation was still erratic. Checking the schematic, he noted power supply bypass electrolytic capacitors on the power supply pins. Tom replaced those capacitors. Still erratic.

Pulling out what little was left of hair, he removed the Op Amp and stuffed in a fresh one. Problem solved.

This all took place shortly after a huge electrical storm during which Tom had witnessed multiple direct strikes to the tower.

Although not certain, Tom sees two issues here. One is that lightning can affect components deep inside a circuit, where normally you’d expect them to be safe and sound. His guess is that the electrolytics, being old, failed due to the exacerbating influence of the lightning. Then, for reasons he cannot fathom, one or the other of the Op Amp’s power supply bypass capacitors became inductive and caused oscillations whose peak voltages exceeded the limits of the 741 Op Amp, thus frying it. Although this is speculation, it reminds us that electrolytics should be replaced every seven years or so.

Tom also recalls that as a station engineer, when he found Mallory-brand electrolytic capacitors in a piece of equipment, he would shotgun all of them. He said he’d had so much difficulty with Mallory electrolytic capacitors that he specified that new equipment must not contain any electrolytic capacitors of that manufacture.

Tom writes that he still carries this prejudice, even while acknowledging that things may have changed since then. He doesn’t do much bench work now, but from time to time he will design little circuits for use in his home environment, and when he orders capacitors, he selects another manufacturer — which is funny, because Tom has never had a Mallory Sonalert fail.

Contribute to Workbench. You’ll help your fellow engineers and qualify for SBE recertification credit. Send Workbench tips and high-resolution photos to johnpbisset@gmail.com.

John Bisset has spent 50 years in the broadcasting industry and is still learning. He handles western U.S. radio sales for the Telos Alliance. He holds CPBE certification with the Society of Broadcast Engineers and is a past recipient of the SBE’s Educator of the Year Award.

The post How to Get Rid of That Mouse in the House appeared first on Radio World.

From IBC: Tieline Unveils Gateway Multichannel IP Codec

Radio World - Wed, 09/18/2019 - 09:11

At IBC2019, Tieline unveiled the new Gateway IP audio codec, which the company says, is a compact and powerful multichannel IP audio transport solution for radio broadcasters. The Gateway streams up to 16 IP audio channels with support for AES67, AES3 and analog I/O as standard.

Featuring Tieline’s SmartStream PLUS redundant streaming and Fuse-IP data aggregation technologies, Tieline promises the Gateway will “herald a new era in multichannel IP codec streaming.”

Tieline Gateway is suitable for STL, SSL and audio distribution applications, as well as managing multiple incoming remotes at the studio. The compact unit is interoperable with all Tieline IP codecs and compatible over SIP with all EBU N/ACIP Tech 3326 and 3368 compliant codecs and devices.

“The new Gateway codec delivers up to 16 mono channels or eight stereo streams of IP audio in 1RU to increase efficiency and reduce rack space requirements,” said Charlie Gawley, Tieline’s VP Sales APAC/EMEA. “The Tieline Gateway interfaces with legacy analog and AES/EBU sources, as well as newer broadcast plants with AES67 IP audio infrastructure. An optional WheatNet-IP interface will also be also available.”

Configurable through an embedded HTML5 Toolbox Web-GUI interface, the Gateway can also interface with the TieLink Traversal Server for simpler connections and is fully controllable using Tieline’s Cloud Codec Controller.

The post From IBC: Tieline Unveils Gateway Multichannel IP Codec appeared first on Radio World.

HD Radio Trial Set to Begin in India

Radio World - Wed, 09/18/2019 - 08:19

Joe D’Angelo, senior vice president of broadcast radio at Xperi, announced during the Xperi HD Radio market update held on the Nautel booth at IBC that HD Radio tests for FM will begin in New Delhi shortly.

Joe D’Angelo announced plans for HD Radio tests in India during a speech on the Nautel booth at IBC.

“We worked with Nautel to get the authorization required to install a test station in Delhi,” D’Angelo said. “We expect to start on-air trialing within a couple of weeks and continue into next year.”

The FM station will broadcast an HD Radio multicast hosting up to four HD signals. According to D’Angelo, in India there is a remarkable interest in second- and third-language programming, mainly due to the large number of languages spoken throughout the country.

The HD Radio test will demonstrate the entire feature set of the digital radio standard, such as dynamic visual content, station logos and emergency alerts services.

“We will run the trial using standard broadcast equipment from Nautel with the same configuration adopted in the United States, as well as with standard commercial receivers, including the first HD Radio-capable cellphone, named BeatBoy,” D’Angelo explained.

[Read: AoIP, Cloud and Digital Radio in Focus at IBC] 

He added that many of the vehicles shipped to India are equipped with the same HD Radio receiver they feature in the U.S. So, even if it’s disabled by default, local dealers can easily activate it. This means thousands of vehicles will potentially be able to receive India’s first HD radio broadcasts once the service begins.

The post HD Radio Trial Set to Begin in India appeared first on Radio World.

In the Matter of Promoting Diversification in the Broadcasting Services

FCC Media Bureau News Items - Tue, 09/17/2019 - 21:00
Order extending filing window and deadline for filing of FCC Form 323 and 323-E

Applications

FCC Media Bureau News Items - Tue, 09/17/2019 - 21:00
.

Broadcast Actions

FCC Media Bureau News Items - Tue, 09/17/2019 - 21:00
.

Actions

FCC Media Bureau News Items - Tue, 09/17/2019 - 21:00
.

Pages

Subscribe to REC Networks aggregator